Less upkeep
Annual cleaning and joint sealing, instead of regular recoating and resurfacing.
Concrete parking lots
Parking lot service
At a glance
Concrete vs asphalt
Commercial applications
Scheduling & coordination
01
02
03
04
05
06
Estimate factors
Why San Diego Concrete Contractors
Related services
Service area
Parking lot questions
Concrete lots need little upkeep beyond annual cleaning and joint sealing, carry heavy loads without rutting and have a lighter surface that can lower lighting and cooling costs. Asphalt lots need recoating and resurfacing over time. We compare both for your site.
Mainly annual cleaning and joint sealing.
Yes. We travel to your place of business to assess the space before the estimate.
Commercial projects are time sensitive. We plan the schedule with you and allocate the right number of people to meet your timeline.
Yes. The concrete color and texture can be customized to suit the property.
Yes. Existing concrete can be broken out and hauled away before the new pour. See concrete demolition.
As a general guide, new concrete can take vehicles after about 3 to 7 days and reaches its full strength at about 28 days. We confirm the timing for your lot. See how long concrete takes to dry.
Start your project